HomeCase StudiesISEE Construct
Case study · ADU Contractor · Vancouver, WA

ISEE Construct: ADU Rankings Across 6 Portland Metro Cities in 90 Days

How ISEE Construct in Vancouver WA went from 4 monthly organic visits to 47 and established map pack presence across 6 Portland metro cities for ADU construction. 90 days.

Campaign: City Architecture Sprint

47

monthly organic visits

was 4 at start

6

cities with ADU rankings

was 1 at start

#5

ADU builders Ridgefield

confirmed by Voodoo

90

days to full metro coverage

Business
ISEE Construct
Location
Vancouver, WA
Trade
ADU Contractor
Engagement type
City Architecture Sprint
Keywords tracked at start
26
Monthly organic visits at start
4
Backlinks
204 from 95 referring domains
Local pack at start
1 appearance across 5 eligible SERPs (20%)
Service area pages at start
4 (Portland Metro, Ridgefield, Battle Ground, Woodland)
01 / The challenge

Serving the Portland ADU Market. Invisible to It.

ISEE Construct was generating just 4 monthly organic visits from 26 tracked keywords despite ADU demand doubling across the Portland metro in 18 months. Existing city pages were indexed but not ranking, GBP service area covered Vancouver WA only, and the primary category was set to General Contractor instead of Home Builder.

Day 1 findings

What the audit found

  • 4 monthly organic visits from 26 tracked keywords. Near-zero commercial visibility in a market where ADU demand had doubled in 18 months due to Oregon and Washington housing legislation.
  • Existing city pages (Portland Metro, Ridgefield, Battle Ground, Woodland) indexed but not ranking. No FAQPage schema. No LocalBusiness schema with city-specific service area.
  • GBP service area configured for Vancouver WA only. Not expanded across the Portland Oregon side of the metro area where ADU demand is concentrated.
  • Primary category set to General Contractor instead of Home Builder, the category Google maps most directly to ADU construction searches.

at engagement start

What Voodoo showed

26

keywords tracked

4

monthly organic visits

204 / 95

backlinks / referring domains

20%

local pack coverage (1 of 5 SERPs)

0

keywords in positions 1 to 3

Strong backlink foundation from 204 existing referring sources. The organic data was there to build on. The content architecture and GBP configuration were the missing pieces.

02 / What we did

The plan we ran

Homerankr corrected the GBP primary category and expanded the service area into Portland OR, built 6 new ADU city pages across the metro with LocalBusiness, FAQPage, and HowTo schema, added FAQPage schema to all existing service pages, and started a review and GBP post cadence.

  1. Week 1

    Corrected GBP primary category and expanded service area to Portland Oregon

    Primary category changed from General Contractor to Home Builder with ADU-specific secondary categories. Service area expanded to include Portland OR, Beaverton, Hillsboro, Gresham, and Lake Oswego, the Oregon side of the metro where ADU permit volumes are highest. 35 project photos uploaded with geo-tagged metadata from completed ADU sites.

  2. Weeks 2 to 4

    Built 6 ADU city pages for target municipalities

    New city pages for Beaverton OR, Portland OR, Hillsboro OR, Lake Oswego OR, Battle Ground WA, and Camas WA. Each page with LocalBusiness schema, FAQPage schema targeting ADU permit process and cost questions for that specific municipality, and HowTo schema for the ADU construction timeline process. Unique copy addressing local permit requirements and ADU regulations for each city.

  3. Week 2

    Added FAQPage schema to all existing service pages

    FAQPage schema added to existing ADU construction, seismic retrofitting, and garage conversion pages. 6 to 8 questions per page targeting how much does an ADU cost, how long does ADU construction take, what permits are needed for an ADU in Portland OR, and what size ADU can be built in Washington State. Direct 50-word answers below each H2 for AI Overview eligibility.

  4. Weeks 3 to 4

    Review automation and GBP post cadence started

    Review automation tied to project completion. GBP post cadence started with ADU project completions, before-and-after photos from garage conversions and detached ADU builds, and permit process educational content. 2 posts per week maintained throughout engagement.

The timeline

What happened, week by week.

  1. Week 1

    GBP category corrected. Service area expanded to Portland metro including Oregon side. 35 photos uploaded. FAQPage schema added to all existing pages.

  2. Weeks 2 to 4

    6 new ADU city pages built and submitted. GBP post cadence started. Review automation installed. Initial ranking movement for Beaverton and Portland ADU queries.

  3. Weeks 5 to 8

    City pages indexing. ADU contractor Beaverton entering top 5. Portland ADU contractor queries showing first-page movement. Organic visits growing from 4 baseline.

  4. Weeks 9 to 12

    47 monthly organic visits confirmed by Voodoo. ADU builders Ridgefield position 5 confirmed. ADU contractor Beaverton OR position 7, was not ranking before. Local pack appearances expanding across Oregon and Washington target cities.

03 / The levers

Levers pulled, in order.

  1. LEVER 02 · Weeks 2 to 4Service and City Architecture6 new ADU city pages across Portland metro on both sides of the state line. FAQPage schema on all existing and new pages. ADU contractor Beaverton now ranking. Portland OR ADU queries producing organic traffic.See this lever →
  2. LEVER 01 · Week 1Map Pack EngineeringGBP category correction. Service area expanded from Vancouver WA to full Portland metro including Oregon. 35 geo-tagged ADU project photos. Local pack coverage expanding across 6 target cities.See this lever →
  3. LEVER 03 · Week 2AI Overview OptimizationFAQPage schema targeting ADU permit and cost queries for Oregon and Washington cities. HowTo schema for ADU construction process. Direct answer content for AI Overview eligibility in a category homeowners research heavily before calling.See this lever →
04 / The results

What it produced

Monthly organic visits grew from 4 to 47, confirmed by Voodoo. ADU rankings were established across 6 Portland metro cities, with ADU builders Ridgefield holding position 5 and ADU contractor Beaverton OR reaching position 7 from not ranking.

ADU demand in our market had doubled but we were not capturing any of it from Google. After the city page sprint we started getting calls from Portland homeowners we had never reached before. The Oregon side of the market opened up completely.
Owner, ISEE Construct · Vancouver WA
More results

Other contractors. Other trades. Same system.

Find out how many ADU searches in your metro area you are currently invisible to.

A free AI Visibility Audit maps every ADU search variation across your metro area and shows exactly which cities have demand you are not currently capturing.

Or write to us at found@homerankr.co

© 2026 Homerankr. All rights reserved.