ISEE Construct was generating just 4 monthly organic visits from 26 tracked keywords despite ADU demand doubling across the Portland metro in 18 months. Existing city pages were indexed but not ranking, GBP service area covered Vancouver WA only, and the primary category was set to General Contractor instead of Home Builder.
Day 1 findings
at engagement start
26
keywords tracked
4
monthly organic visits
204 / 95
backlinks / referring domains
20%
local pack coverage (1 of 5 SERPs)
0
keywords in positions 1 to 3
Strong backlink foundation from 204 existing referring sources. The organic data was there to build on. The content architecture and GBP configuration were the missing pieces.
Homerankr corrected the GBP primary category and expanded the service area into Portland OR, built 6 new ADU city pages across the metro with LocalBusiness, FAQPage, and HowTo schema, added FAQPage schema to all existing service pages, and started a review and GBP post cadence.
Primary category changed from General Contractor to Home Builder with ADU-specific secondary categories. Service area expanded to include Portland OR, Beaverton, Hillsboro, Gresham, and Lake Oswego, the Oregon side of the metro where ADU permit volumes are highest. 35 project photos uploaded with geo-tagged metadata from completed ADU sites.
New city pages for Beaverton OR, Portland OR, Hillsboro OR, Lake Oswego OR, Battle Ground WA, and Camas WA. Each page with LocalBusiness schema, FAQPage schema targeting ADU permit process and cost questions for that specific municipality, and HowTo schema for the ADU construction timeline process. Unique copy addressing local permit requirements and ADU regulations for each city.
FAQPage schema added to existing ADU construction, seismic retrofitting, and garage conversion pages. 6 to 8 questions per page targeting how much does an ADU cost, how long does ADU construction take, what permits are needed for an ADU in Portland OR, and what size ADU can be built in Washington State. Direct 50-word answers below each H2 for AI Overview eligibility.
Review automation tied to project completion. GBP post cadence started with ADU project completions, before-and-after photos from garage conversions and detached ADU builds, and permit process educational content. 2 posts per week maintained throughout engagement.
Week 1
GBP category corrected. Service area expanded to Portland metro including Oregon side. 35 photos uploaded. FAQPage schema added to all existing pages.
Weeks 2 to 4
6 new ADU city pages built and submitted. GBP post cadence started. Review automation installed. Initial ranking movement for Beaverton and Portland ADU queries.
Weeks 5 to 8
City pages indexing. ADU contractor Beaverton entering top 5. Portland ADU contractor queries showing first-page movement. Organic visits growing from 4 baseline.
Weeks 9 to 12
47 monthly organic visits confirmed by Voodoo. ADU builders Ridgefield position 5 confirmed. ADU contractor Beaverton OR position 7, was not ranking before. Local pack appearances expanding across Oregon and Washington target cities.
Monthly organic visits grew from 4 to 47, confirmed by Voodoo. ADU rankings were established across 6 Portland metro cities, with ADU builders Ridgefield holding position 5 and ADU contractor Beaverton OR reaching position 7 from not ranking.
ADU demand in our market had doubled but we were not capturing any of it from Google. After the city page sprint we started getting calls from Portland homeowners we had never reached before. The Oregon side of the market opened up completely.